Checked against the law on 12 November 2026.

Do I need planning permission for solar panels?

In England, solar panels (solar PV or solar thermal) on a house are likely permitted development if they stick out no more than 0.2 metres from a pitched roof slope and are no higher than the highest part of the roof, or no more than 0.6 metres above a flat roof. On a wall, the limit is 0.4 metres, or 0.2 metres if the wall abuts a highway. Panels on a listed house, or on a building in its grounds, likely need planning permission. In a conservation area, panels on a wall that fronts a highway likely need planning permission. A building in the garden, such as a garden room, shed or garage, follows the same limits as the house. For a block of flats, the checker asks the council. This page covers panels on a building, not ground-mounted panels.

Check your address

The address matters because listed buildings, conservation areas, World Heritage Sites, Article 4 directions and planning conditions can take this right away or tighten it.

For example, SW1A 2AA

The rules

These are the limits for a house. A building in the garden, such as a garden room, shed or garage, follows the same limits as the house. A block of flats has separate limits, so for flats the checker asks the council. Schedule 2, Part 14, Class A, paragraph A.1(1) (block of flats)

  1. Microgeneration only. The right covers solar PV or solar thermal equipment for microgeneration, as defined in the Energy Act 2004. Schedule 2, Part 14, Class A (permitted development), Energy Act 2004, section 82(6)
  2. Pitched roof. The panels can stick out no more than 0.2 metres beyond the roof slope, and can be no higher than the highest part of the roof, not counting a chimney. Schedule 2, Part 14, Class A, paragraph A.1(2)(c)Schedule 2, Part 14, Class A, paragraph A.1(2)(c)
  3. Flat roof. The highest part can be no more than 0.6 metres above the highest part of the roof, not counting a chimney. Schedule 2, Part 14, Class A, paragraph A.1(2)(d)
  4. Wall. On a wall that abuts a highway, panels can stick out no more than 0.2 metres from the wall. On any other wall the limit is 0.4 metres. Schedule 2, Part 14, Class A, paragraph A.1(2)(a)(i)Schedule 2, Part 14, Class A, paragraph A.1(2)(a)(ii)
  5. Balcony or roof enclosure. Panels on a balcony enclosure or roof enclosure can stick out no more than 0.2 metres (where it abuts a highway) or 0.4 metres (in any other case) beyond the enclosure. Schedule 2, Part 14, Class A, paragraph A.1(2)(b)
  6. Plug-in solar and wood. Plug-in solar cannot have any part on a wooden wall, balcony or enclosure, or on any timber-clad part of the outside of the building. Schedule 2, Part 14, Class A, paragraph A.1(2)(h)

Worked examples

Designated land and listed buildings

Panels on a listed house, or on a building within its curtilage, likely need planning permission. Panels on a scheduled monument are not covered either. Schedule 2, Part 14, Class A, paragraph A.1(2)(g)Schedule 2, Part 14, Class A, paragraph A.1(2)(f)

In a conservation area or World Heritage Site, panels cannot go on a wall, balcony enclosure or roof enclosure that fronts a highway. Schedule 2, Part 14, Class A, paragraph A.1(2)(e)Schedule 2, Part 14, Class A, paragraph A.1(2)(e) On article 2(3) land, a flat roof installation needs a prior approval determination on the effect of its appearance before you start. If the council gives no notice within 56 days, you may begin. Schedule 2, Part 14, Class A, paragraphs A.2(ba), (bb)

Conditions

What this checker cannot see

It cannot see the exact shape of your roof, how far panels will stick out or the plane of the wall, or any listed building consent. Ground-mounted panels have their own limits and are not covered here. Building regulations and your electricity network operator are separate.

What to do next

Enter your postcode above to see the constraints at your address. To get the council's written confirmation, apply for a lawful development certificate . We are preparing a paid report for your address, with the constraints, the limits for your project, the sources and the questions to ask the council.

Change log

  1. : First published.

Last updated 12 November 2026.