Larger home extensions: the prior approval route

In England, a single storey rear extension that goes more than 4 metres beyond the back wall of a detached house (3 metres for any other house), and up to 8 metres (6 metres), likely needs prior approval, if it is no more than 4 metres high and the house is not on article 2(3) land or a site of special scientific interest. You tell the council. It tells your adjoining neighbours, who have at least 21 days to object. It looks only at the effect on their amenity. You can build if the council has not told you its decision within 42 days.

Check your address

The address matters because this route is closed in conservation areas and other designated land, and Article 4 directions and planning conditions can remove it.

For example, SW1A 2AA

When the route applies

It covers a single storey extension that goes beyond the limit for a normal permitted development extension but stays within the larger limit. Both limits are measured from the rear wall of the original house. Schedule 2, Part 1, Class A, paragraph A.4(1)

Plan view of a detached house with the area behind it in three bands. Up to 4 metres beyond the rear wall: likely permitted development. 4 to 8 metres: likely needs prior approval. Over 8 metres: likely needs planning permission. House Up to 4 m Likely PD 4 to 8 m Prior approval Over 8 m Planning permission Depth beyond the rear wall
In words: for a detached house, up to 4 metres is likely permitted development, more than 4 and up to 8 metres likely needs prior approval, and over 8 metres likely needs planning permission. For any other house the numbers are 3 and 6 metres.

What you send the council

Before you start, you give the council a written description of the extension. It gives how far the extension goes beyond the rear wall, its maximum height and its eaves height. If it joins an earlier extension, the figures are for the whole. You also send a plan, the addresses of the adjoining properties, a contact address and, if you like, an email address, and the fee. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(2)

The fee is £249 from 1 April 2026. A rise has been drafted but, as at our last check, not made, so we show the current fee.

What the council does

  1. It can refuse if the work does not comply or the information is not enough. You can appeal that refusal. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(3) and (4)
  2. It writes to each adjoining owner or occupier and gives them a date at least 21 days away to comment. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(5) and (16)
  3. If a neighbour objects, prior approval is needed, and the council looks only at the effect on the amenity of the adjoining premises. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(7)
  4. It considers the amenity of all adjoining premises, not only those of neighbours who object. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(9)
  5. It can approve with or without conditions about that amenity. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(12)

When you can start

You cannot start until one of three things has happened: you have the council's written notice that prior approval is not required, you have its written prior approval, or 42 days have passed since it received your information without a decision. You then build as approved, or as you described it if the 42 days passed. Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(10)Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class A, paragraph A.4(11)

Other limits still apply

Prior approval lifts only the depth limit. The other Class A limits still apply, such as height, eaves, the half-garden limit and the position in front of the house. See how big a rear extension can be . The route is closed on article 2(3) land (conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites) and on a site of special scientific interest. An Article 4 direction or a planning condition can also remove it. Schedule 2, Part 1, Class A, paragraph A.1(g) (not available on article 2(3) land)Schedule 2, Part 1, Class A, paragraph A.1(g) (not available on a site of special scientific interest)

Prior approval is not a lawful development certificate . It is the route for this size of extension, and the council does not issue a certificate that the work is lawful. If you want that written confirmation, apply for the certificate separately.

Worked examples

What to do next

Enter your postcode above to see the constraints at your address. The council's own pre-application advice can tell you how it reads your plans. We are preparing a paid report for your address, with the constraints, the limits for your project, the sources and the questions to ask the council.